Leading by Example Projects
The requested leading by example project is no longer available, our current leading by example projects are listed below.
The United Church

End of life heating/cooling conversion from natural gas to geothermal at The United Church in Meadowood. Read More »
St. Theresa Point

The St. Theresa R.C. Church and Rectory was in major need of a heating system upgrade and switched to geothermal in 1999 and was rebuilt in 2024. Read More »
East St. Paul Geothermal Retrofit

This complex project involved removing three existing fan coil units and upgrading to three geothermal heat pumps. Read More »